Case study

Baku Olympic Stadium — heating & cooling fit-out

617,000 m² Olympic stadium with 68,000 capacity. All indoor and outdoor heating and cooling systems designed and delivered with Polimeks.

Client

Polimeks (main contractor)

Location

Baku, Azerbaijan

Completed

Mar 2015

Scale

617,000 m²

Duration

27 months

Despite the groundbreaking ceremony in 2011, excavation and stadium construction only began in November 2012. The stadium was completed on 28 February 2015, with the official opening on 6 March 2015.

The total layout is 617,000 m² with capacity for 68,000 spectators across six floors. Stadium settlement area is 87,000 m², total indoor area is 215,000 m², with a maximum height of 60 m. All indoor and outdoor heating and cooling systems were designed, supplied and commissioned in partnership with Polimeks.

Project details

  • Total area: 617,000 m²
  • Capacity: 68,000 spectators
  • Indoor area: 215,000 m²
  • Stadium settlement area: 87,000 m²
  • Floors: 6
  • Maximum height: 60 m
  • VIP suites: 127
  • Parking: 3,078 vehicles